• Home
  • Get Started
    • Developer
    • Builder
    • Architect / Engineer
    • Self-Build
  • Products
  • About
    • Contact Us
    • Useful Links
    • Newsletter
  • Project Profiles
  • Warranties and Approvals
  • Sound and Fire Testing
  • Renewable Heating Requirement Example

XR35 PHPP

  • Uncategorised
  • Hits: 1919

ICF Wall, Lintel & Jamb_EPS, EPS reveal closure

ICF Wall, Cill_EPS, EPS reveal closure

ICF Wall, Gnd Floor, Beam and Block or Ground Bearing

ICF Wall, Int_Conc_Floor, Within a Dwelling (Houses)

ICF Wall, Int_Timber_Fl, Within a Dwelling (Houses)

ICF Wall, Party Floor, Between Dwellings (Flats)

ICF Wall, Party Floor+EPS, Between Dwellings (Flats)

ICF Wall, Balcony

ICF Wall, Balcony_TBreak

ICF Wall, Eaves, Minimum Roof U-value 0.1

ICF Wall, Gable @ Ceiling, Minimum Roof U-value 0.1

ICF Wall, Gable @ Rafters, Minimum Roof U-value 0.1

ICF Wall, External Corner

ICF Wall, Int_Corner

ICF Wall, Party Wall

Intermediate concrete floor 20cm thick w/o insulation or ceiling underneath

Concrete Groundfloor with insulation above (100mm, R=4.65) and concrete screed

Entrance upper floor with woodwool insulation Fibrastyren 125mm R=3.5 underneath

20cm concrete Upper floor under the roof with mineral wool 30cm R = 7.5

Intermediate floor with extension under outside deck

Upper floor as flat roof with sealing – 20cm concrete + 12cm insulation R = 5.2

Separating wall 18cm conrete (w/o insulation either side of the wall)

ICF Wall, Flat Roof, Minimum Roof U-value 0.13

1.0.0.20
By Super User
Share with:
  • Contact
  • Center
  • Legal Notice
  • Privacy
  • Location
  • Privacy Policy
  • Cookies
© 2018 The Fell Partnership Ltd